Isle of Eigg Buyout and Hydro is a record in the case register, checked against its sources in two enrichment passes on 9 November 2026. Its claim grade is [IC].

Right of reply

This page describes the communities, organizations and programs in this case only through their published records and statements. None has yet been invited to comment. Responses and corrections will be recorded here with their date. [MS] marks a claim that rests on the account of the party the claim is about.

Coding

The codes are explained on the case register page. Coordinates are an approximate centroid for map views.

FieldEntry
Country and regionUnited Kingdom, Inner Hebrides
Mountain systemIsland uplands
ClimateCfb; ~1,500-2,000 mm
Period1997 buyout
LineageCommunity land trust
Assets mobilizedA2 A3 A4 A5 A7
Retention methodsRun-of-river hydro
Coordination (TIME)E+M
TenureTrust
Value flowResidents pay for power from a GBP 1.6 million community grid funded by the trust, residents’ fees, lottery, regional and EU grants; the trust owns the island, bought for GBP 1.5 million in 1997
Beyond-market markersB1 B2 B6
Water outcomeNot measured
Community outcomePopulation rose from 65 at the buyout to 109; renewables (184 kW of hydro, wind and solar) supply 95% of energy use
PersistenceCommunity ownership since 1997; 24-hour renewable power from 1 February 2008
Capture or harmTourism growth reported to strain water supply and waste disposal
Evidence, waterE5
Evidence, communityE5
Claim grade[IC]
Independent of implementing partneryes

What the sources show

The Development Trusts Association Scotland case study reports that the Isle of Eigg Heritage Trust bought the island in 1997 for £1.5 million, with residents holding half the votes and the Scottish Wildlife Trust among the other partners. Hydro, wind and solar (184 kW in all) supply 95% of the island’s energy use, and the population has risen from 65 to 109. It also notes that doubled tourist numbers have brought water shortages [MS]. The hydro uses the island’s streams; no water measurement was found.

Second enrichment run. The second enrichment run found independent sources. Chmiel and Bhattacharyya (2015) modeled the Eigg off-grid system and report a renewable fraction of 0.89 in one configuration. The European Commission records a £1.6 million network funded by the trust (£140,000), residents’ connection fees (£51,000), the Big Lottery Fund, Highlands and Islands Enterprise, ERDF (£764,000), the Highland Council and the Energy Saving Trust, and notes that residents agreed to cap use at 5 kW per household and 10 kW per business [IC]. The cap is a rule the users set for themselves.

In the briefs

Sources

Provenance

Created on 9 November 2026 from row UK-EIGG-HYDRO of the Mountain Water Commons case table, when that table moved into the case register. Entries are copied from the table without change; the lineage_type, tenure_type, climate_group and coordinates keys were added for filtering. Page status follows the claim grade: [IC] gives academic-inference, [MS] gives working-hypothesis, [TBV] gives stub. Enriched on 9 November 2026: the entries were checked against the sources listed, the grade was set to [MS] on that basis ([IC] for a peer-reviewed study, an official record or two independent sources; [MS] where the only source is the party or its partner), and the Sources section now gives full citations. A second, multilingual enrichment run the same day added the sources marked in the second paragraph of What the sources show and set the grade to [IC].